Dates from the active academic calendar, plus the campus language and local details students actually need. Every entry comes from DormWay's approved campus reference library.
Relevant term
School Year 2026-2027
Campus terms
6
Local details
6
Academic calendar
School Year 2026-2027 runs Aug 18, 2026 – Jun 10, 2027. Calendar aliases that share a date range are grouped together, with every source term still shown.
Recommendations are based on public campus sources. We do not endorse student organizations.
Using DormWay at Richmond High
What the product handles for students.
Syllabus to schedule
Upload your Richmond High syllabus to organize dates and course details
Workload planning
Balance your courseload with helpful workload distribution
Free student access
Core organization is free for Richmond High students. Optional Pro tools are in development.
Richmond High on DormWay
Current DormWay activity for this campus
2
Active Students
Life in Richmond for Richmond High Students
Everything you need to know about living and studying in Richmond.
Timezone
Pacific Time (PT)
Median Rent
$2,300
Cost of Living Index
160
Student Population
25,000
City Transportation
Walkability
62
Bikeability
60
Public Transit
BART (Richmond Station terminus of Richmond–Millbrae and Richmond–Fremont lines), AC Transit regional bus service, WestCAT bus service (regional), Amtrak Capitol Corridor and San Joaquin (Richmond Station), Ferry service via nearby terminals (e.g., Richmond Ferry to San Francisco)
Nearest Airports
Oakland International Airport, San Francisco International Airport, Richmond Airport Field (general aviation nearby), Buchanan Field Airport (regional, in Concord)
Climate Averages
Climate
Mediterranean (Csb) / coastal marine
Avg Annual Temp
58°F
Avg Snowfall
0 in
Campus Operations Snapshot
Parking and Transit
Front Visitor Lot
surface_lot • Limited
Located off 23rd St; single entry point for campus security.
Main Student/Staff Lot
surface_lot
Available for rent via Facilitron for community events.
Campus News
Latest updates from Richmond High
Richmond High Breaks Ground on $280 Million Modernization Project
The West Contra Costa Unified School District officially broke ground on a massive transformation of the century-old campus, including a new 60,000-square-foot classroom building and music wing.
Kennedy High Reopens After Environmental Testing Finds No Toxic Vapors
Nearby Kennedy High School was cleared to reopen for the 2026-2027 school year after third-party testing confirmed the campus was safe from previously detected soil vapors.